Introduction

The issuance of Public Procurement Directive No. 1073/2025 (the “Directive”) by Ethiopia’s Ministry of Finance marks a significant achievement in the country’s public financial management reform. As a comprehensive and unified legal instrument, the Directive replaces a series of previously disjointed directives, bringing coherence to the government procurement framework by codifying the end-to-end procurement lifecycle from planning and tendering to contract administration and dispute resolution under one directive, thereby addressing long-standing challenges of fragmentation. The Directive revised approach to bidder preference, incorporated digital procurement system, strengthened rules on institutional responsibilities, expanded procurement methods, enhanced bid and evaluation procedures and clearer provisions for contract execution and oversight. Therefore, this Directive is expected to implement the Public Procurement Proclamation No. 1333/24 (the “Public Procurement Proclamation”) and lay the groundwork for a more inclusive, accountable and development-oriented public procurement system.

  1. Participating Governmental Bodies and Their Respective Responsibilities
No.Relevant AuthorityMajor Roles and Responsibilities
1Ministry of Finance (MoF)The MoF is responsible for setting procurement policy directions and collaborating with other institutions to improve the procurement framework. It develops directives for specialized Public Bodies and decides on strategic system-level reforms. It also plays a coordinating role in imposing e-procurement system usage fees and authorizations.
2Public Procurement and Property Administration Authority (the Authority)The Authority is the central regulator and manager of Ethiopia’s electronic procurement system, ensuring its continuous functionality, security and accessibility. It issues user licenses to government agencies, prepares standard documents, monitors procurement data and ensures transparency and integration with financial systems. Additionally, it leads capacity building, policy harmonization, and professionalization efforts across all public procurement entities.
3Head of Public BodiesThe Head of a Public Body ensures that procurement staff are qualified, that proper organizational and oversight structures are in place, and that procurement activities align with legal and procedural requirements. They approve plans, manage contracts, handle complaints and oversee compliance and reporting. They are also responsible for timely submissions, avoiding payment delays, and coordinating with tax and audit bodies.
4Procurement UnitsProcurement Units operationalize the procurement process by planning, preparing bid documents, managing tenders, and evaluating bids in collaboration with relevant internal units. They ensure compliance with procedures, handle contract administration in the absence of a dedicated unit and generate procurement performance reports. They are the technical organs of procurement implementation within Public Bodies.
5Procurement and Disposal Endorsing CommitteeThis Committee verifies procurement plans and bid documents for compliance, reviews and decides on bid evaluations, and ensures that procurement decisions are justified and robust. It reports to the Chief Executive of the Public Body and provides clarifications to oversight bodies. It also approves performance guarantee releases and ensures alignment with legal and operational standards.
6Ad-hoc Procurement Evaluation CommitteeFormed for complex technical procurements, this committee conducts fair and impartial technical evaluations based on predefined criteria, excluding price reviews. It submits its reports to the Procurement Unit and ensures compliance with technical specifications. It may also handle additional tasks as delegated by the head of the Public Body.
7System AdministratorsSystem Administrators manage institutional registration and configuration within the e-procurement system, ensuring all procurement personnel and entities are properly recorded. They assign system roles, support third-party access, and facilitate digital procurement workflows. Their role ensures that system access and functions align with the internal procurement structure and mandates.
  • Stages in Preparation, Review and Publication of the Procurement Plan

The preparation of a public procurement plan is a structured, multi-layered process that ensures public bodies align their purchasing needs with their operational and financial programs. It begins with the Procurement Unit initiating the process through the electronic procurement system, prompting all user departments such as executives and directorates to submit procurement needs in line with annual work plans and budgets. These departments, referred to as “Work Units” by the Directive, are expected to provide detailed, justifiable procurement requirements, which are then verified in terms of their accuracy and market feasibility. Consolidation of similar needs and identification of priority items, such as goods of strategic importance, construction works and critical services, is an important procedure, with emphasis placed on ensuring the market has sufficient supply capacity and that technical specifications are prepared or planned in consultation with experts.

Once the data is collected, the Procurement Unit compiles and structures the plan to avoid fragmentation, promote competition and ensure efficiency in cost and time and eliminate any last minute setbacks in execution. The plan must categorize procurements based on dominant components (type or quantity of procurement, technical specification or estimated financial cost, budget and source of financing), include the procurement method for each item, define execution timelines and adopt principles in line with those outlined in the Public Procurement Proclamation. Moreover, special attention is given to promoting participation from disadvantaged groups such as local manufacturers, women-owned businesses, associations of persons with disabilities and SMEs, which will be discussed in the next section. The plan undergoes review by the Procurement Endorsing Committee, which checks for alignment with legal, financial and operational standards before submission to the Head of the Public Body for approval. Once approved, the plan is to be published by July 30 (Ethiopian calendar) via the e-procurement system and the agency’s website.

The electronic procurement system is the backbone of the entire public procurement lifecycle, from planning to contract execution. All parties involved in procurement, including public bodies, suppliers, bidders, financial institutions and auditors, are expected to conduct procurement-related communication, document exchanges, announcements, evaluations and complaint processes through the system. This centralized platform ensures transparency, traceability, efficiency and equitable access. By mandating the use of such an electronic procurement system in both the preparation and execution stages, the system significantly reduces procedural inconsistencies and corruption risks while enhancing data management and decision-making.

  • Preferences in Public Procurement

The Directive outlines a framework for preferences in public procurement, granting competitive advantages to Ethiopian goods, service providers, contractors, consultants and, more importantly, marginalized groups such as women and persons with disabilities. These preferences apply to all procurement methods except direct procurement and requests for quotation. The Directive promotes domestically produced goods and provides a mechanism where bidders are evaluated based on the price and domestic value addition (the difference between the total production cost and the cost of imported raw materials, supplies and foreign services) which is verified through certified audit reports. The preference also extends to Ethiopian service providers and contractors, offering a 7.5% price preference for construction and consultancy services and a 3% preference for non-consultancy services. Eligibility requires individuals to be Ethiopians or foreign nationals of Ethiopian origin and majority Ethiopian ownership, governance, and minimum of 40% of local employee met is expected on the side of entities. Contractors who commit to subcontracting 20% of project value to micro and small enterprises receive an additional 2% preference. The Directive further prescribes preference for joint ventures or consortiums with a 3.5% preference to Ethiopian nationals engaged in international tenders where foreigners are involved. The share and employment number of local partners in after-sales services, training and technological transfer must be clearly defined and account for at least 40% of the bid value. An additional 2% preference is granted where at least 20% of the total contract for consortium, partnerships or joint venture established between foreign and domestic entities is subcontracted to local SMEs.

Beyond the domestic-based preferences, the Directive prioritizes certain groups to advance social and economic inclusion. Micro and small enterprises (MSEs) engaged in manufacturing are entitled to a 3% price preference among both domestic and foreign bidders and further enjoy a privilege to selected when the score equals with other bidders and also with respect to reduction of bid and security requirements and fee waivers for bid documents. MSEs must supply their own manufactured products, participate in tenders valued up to ETB 10 million and supply documents such as certificate of good performance and letter attesting the fact that the license has not been transferred and the MSEs operate solely as MSEs, to be eligible. Associations of persons with disabilities and women’s enterprises involved in manufacturing are likewise granted a 3% price preference, provided they meet ownership, registration (at least 70% ownership for persons with disabilities) and licensing criteria. Products derived from technological innovation receive a 5% preference when they promote environmental sustainability, import substitution, knowledge economies or commensurate with government priorities. These innovations must be verified by a competent authority through appropriate certification. Moreover, exclusive procurement opportunities are reserved for job creation enterprises such SMEs and cooperatives societies for construction works up to ETB 30 million and materials or food items up to ETB 5 million. Apart from that, Public Bodies may undertake procurement in a single budget year up to a cumulative value not exceeding ETB 100 million and 20 million for construction works and construction materials such as woods, metal products and foodstuff item.  Public Bodies may also prioritize such enterprises when outsourcing services like staff club operations. The Directive mandates that bidders eligible for multiple preference categories must choose only one, which is the highest in value, and that tiebreakers among equal-scoring entities follow a hierarchy: persons with disabilities first, followed by women’s associations, then MSEs. These preferences must be explicitly stated in bidding documents to ensure transparency and uniform implementation.

  • Pre-Qualification Criteria for Bidders

The Directive sets out a series of pre-conditions for bidders before conducting an evaluation process. In line with Article 24 of the Public Procurement Proclamation, bidders are expected to fulfill mandatory documentary and legal requirements, including holding valid VAT registration (unless exempt), trade registration and licenses, excise tax registration (where applicable), and submission of a bid security. They must also submit properly completed bid forms, declarations, tax clearance, and anti-collusion certificates, and where relevant, provide competency documents such as manufacturer authorizations or consortium agreements. Exceptionally, suppliers not registered for VAT may be permitted to participate in a one-time procurement valued up to ETB 500,000. In addition, bidders apart from those registered in the securities market are required to disclose their beneficial owners, defined as individuals holding 10% or more shares, those exerting significant influence or control, or who ultimately control the entity regardless of registration status. Failure to correctly disclose beneficial ownership may result in bid disqualification with legal consequences. Bidders who do not meet these pre-qualification conditions will not advance to the detailed evaluation stage, though they may be allowed to submit missing legal documents (excluding bid security) during preliminary evaluation if those documents were issued prior to bid closure.

The Directive also elaborates on conflict of interest and bidder restrictions, including former public employees, public enterprises and the preparation of technical specifications. A bidder is deemed to have a conflict of interest if it has participated in preparing bid documents or consultancy services, is associated with entities influencing other bidders or procuring officials, submits more than one bid through affiliated entities, is represented by the same individual as other bidders, or has family or employment ties with procurement staff. Failure to disclose such conflicts can lead to disqualification or contract cancellation. Former public employees may only bid if at least one year has passed since leaving public service, and those previously involved in procurement preparation are completely barred from participating in related tenders. Disclosure obligations extend to any professional or familial ties, and violations including indirect participation through family members or related businesses, are subject to penalties, including listed under debarred suppliers. Public enterprises affiliated with a parent public body may only compete in procurements issued by another public body via a competitive bidding process bidding. In terms of technical preparation, public bodies are required to develop detailed technical specifications based on user needs, covering functional, operational, and quality parameters. These specifications must be neutral, avoid exclusive references to brands or origins (unless justified), and should be developed jointly by procurement staff and technical experts or external consultants. The specifications become part of the contract and are used to assess bid compliance and post-award performance, with evaluations based on minimum standards or a scoring system when justified.

  • Sustainable Procurement System and Ethics

The Directive establishes a system for promoting sustainable procurement and ethical conduct in public procurement processes. It introduces a mandatory life-cycle cost analysis (LCC) for designated goods and construction works, as determined by the Authority, requiring Public Bodies to incorporate LCC considerations during planning, bid document preparation, technical specification drafting, and evaluation stages. Bidders must submit separate statements outlining operational, maintenance, spare parts, and disposal costs, which, together with the initial bid price and adjusted for residual value, are used to calculate the total ownership cost through a prescribed formula. These costs must be substantiated with credible documentation and are evaluated for competitiveness, though they do not constitute contractual obligations unless stated otherwise.

The Directive further obliges Public Bodies to adopt environmentally conscious procurement practices by favoring recyclable materials, low-emission technologies and verifying that reuse of existing goods is not feasible prior to initiating new procurements. It also embeds social responsibility by mandating that procurement processes generate community benefits and give preference to MSEs, women’s associations, persons with disabilities and job-creation institutions. Ethical considerations such as confidentiality, disclosure and recusal in conflict of interest situations and a prohibition on accepting gifts, employment offers or advantages from bidders are incorporated in the Directive requiring observance from the parties involved in the procurement process. Employees of Public Bodies are required to act in a fair and transparent manner by granting equal access to information and employing uniform application of criteria to bidders. They are further expected to execute contracts impartially and have the obligation to report corruption. All participants must also demonstrate competence by applying relevant skills and continually improving procurement practices to ensure quality, value for money and compliance with applicable standards.

  • Procurement Methods

The Directive categorizes public procurement methods into four broad types: open tendering, selective tendering, limited tendering, and direct procurement, each governed by specific conditions and procedural requirements.

  •   Open Tendering

Open tendering is the principal and default method of procurement, and it is divided into national and international open tendering. National open tendering applies when the procurement of goods, works, or services can be entirely sourced locally and falls within a financial thresholds of ETB 3 billion for construction, ETB 1 billion for goods, ETB 90 million for consultancy services and ETB 250 million for other services. Only domestic suppliers, defined as those registered under Ethiopian law regardless of shareholding, may participate in national tenders. International open tendering is mandatory when the procurement value exceeds the above thresholds or when there is insufficient local competition. In such cases, procurement documents must be prepared and  issued in English, the statement of requirement submitted by the bidders should be in line with domestic and, if possible, international standards and the bid price must reflect the full cost including customs duties, taxes, insurance and transportation. International procurement could also be conducted through the other procurement methods provided that one of the following exists: a justification in doing for not conducting the procurement locally, adhering to the principles of domestic open tendering procedural requirement, specially stipulating the applicable method and if it is advantageous in terms of time and quality.

  •   Selective Tendering

Selective tendering includes three distinct sub-methods: two-stage bidding, pre-qualification tenders, and requests for expressions of interest, each designed to handle complex or specialized procurements. In two-stage bidding, bidders first submit technical proposals without prices, allowing the procuring entity to assess conceptual approaches and issue clarifications. Final bids with complete technical and financial details and with the submission of bid security and price are then submitted in the second stage. Prequalification tenders are used for high-value or technically demanding procurements and involve evaluating a bidder’s ongoing construction work currently being undertaken, financial capacity and experience prior to inviting them to submit final bids. The number of prequalified bidders is not restricted, and the method ensures that only capable and relevant suppliers are considered.

Public Bodies are required to procure consulting and other intellectual services through a formal Request for Expression of Interest (REOI) when the estimated contract value exceeds ETB 7 million. The REOI must be supported by a Terms of Reference that outlines the background, scope, objectives, and limitations of the required service, and must clearly state submission requirements, qualifications, deliverables, and timelines. Based on the evaluation of submitted expressions, three to seven top-ranked consultants are shortlisted and invited to submit full proposals. Consultant selection methods include quality-and-cost based selection, quality-based selection, fixed-budget selection, least-cost selection, qualification-based selection, and single-source selection, each governed by specific conditions. For quality-and-cost-based selection, bidders scoring more than 70% in both financial and technical proposals initial stage will be shortlisted and their technical proposals are weighted at 80% and financial proposals at 20%, with technical scoring considering experience, methodology personnel, knowledge transfer and local participation. In quality-based selection, the highest technically ranked consultant is selected if their financial proposal is within budget. For fixed-budget selection where the budgets is fixed and limited, technically qualified consultants within the budget are evaluated, and the best technical scorer is awarded the contract. The least-cost method applies to simple, low-value services, where the lowest-priced technically qualified bidder wins. Qualification-based selection is limited to urgent or low-value contracts under ETB 1 million, while single-source selection is reserved for exceptional circumstances.

  •   Limited Tender

The limited tender procurement method allows Public Bodies to conduct competition among a select number of suppliers without a public advertisement, using either restricted bidding or Request for Quotation (RFQ). Restricted bidding is applied where goods or services are available only from a few suppliers, when prior open tenders fail, or when the procurement value falls below defined thresholds ranging ETB 60 million for construction, ETB 12 million for goods, ETB 7 million for consultancy and ETB 9 million for services. In such cases, at least five prequalified suppliers must be invited electronically, and Public Bodies may opt for bid assurance forms over bid securities to encourage participation. For consultancy under restricted bidding, standard RFP procedures apply. Meanwhile, RFQ is permitted when items are urgently needed, market-ready or not suited for bulk procurement. It requires at least three registered suppliers to be invited, with thresholds capped at ETB 2 million for construction, ETB 800,000 for goods, ETB 500,000 for consultancy and ETB 600,000 for services. In case where the Ministry of Foreign Affairs demands it, diplomatic missions abroad may conduct local procurement through RFQ for maximum of USD 30,000 per transaction. RFQ may also be used without thresholds in cases of confidentiality, perishability and research needs. Student food supplies at higher education institutions may be procured via RFQ, including framework agreements, provided proper market surveys conoffice availability and competitiveness. RFQ submissions are final and non-negotiable, and fairness is ensured through rotation and tax-inclusive pricing rules. The supplier’s offer and purchase order form a binding contract unless a formal one is required.

  •   Direct Procurement

Direct procurement is a method reserved for specific, justifiable circumstances put forward under the Public Procurement Proclamation and may only be employed when the predefined conditions are met. Public Bodies may acquire additional goods or services up to 25% of the original contract value under the same supplier and price terms within a specified timeframe (during the validity period of the original contract or within nine months from the completion date of the original contract), or similarly procure additional construction works not exceeding 30% of the initial contract if it proves more economical or technically necessary. Direct procurement is also permitted when goods or services must be compatible with existing systems, when only limited suppliers exist, or when items are confidential, perishable, or urgently needed. When goods, services, or works are unavailable through regular suppliers, Public Bodies may conduct direct procurement through a special shopping method. This involves preparing a memorandum approved by the Head of the Public Body, forming a three-member ad-hoc committee (including a technical expert where possible). The committee selects suppliers based on quality and price, negotiates terms, documents the transaction details, ensures safe delivery, and submits a report to the Head of the Public Body. Procurement information must then be disclosed via the government e-procurement system. Additionally, small-scale procurements such as travel-related or unplanned purchases not exceeding 50,000 Birr per transaction and totaling no more than 1,000,000 Birr annually, may be conducted. Diplomatic missions may also use this method for urgent needs, with individual purchases capped at USD 300 and annual totals at USD 6,000. Additionally, Public Bodies may procure from other Public Bodies if conditions such as cost-effectiveness and non-commercial use are fulfilled. They may also conduct negotiation prior to a direct procurement contract under certain criteria, such as timeframe, quantity, and pubic interest. Before finalizing any direct procurement, negotiations are mandatory and must cover price, delivery, technical specifications, warranties, and value for money. A minimum three-member team with relevant experience must oversee negotiations, guided by a plan, ensuring transparency, fairness, and compliance. All negotiation processes must be documented, reviewed, and approved before contract execution.

  •   Procurements Requiring Special Permission

Procurement through special permission is allowed under the Public Procurement Proclamation when compelling reasons justify deviation from standard procedures, and such permission may only be granted by the Minister of the respective Public Body or, where applicable, the Head of institutions accountable to the House of Peoples’ Representatives, the House of Federation, or the Office of the Prime Minister. This authority is non-delegable and is exercised strictly in exceptional cases where following regular procedures proves unfeasible. Requests for special permission must originate from the procurement department or the Head of the Public Body and be supported by detailed justifications, evidence of urgency, scope, value, and expected socio-economic benefits. Responses must be impartial, timely, and well-reasoned, ensuring minimal deviation from procurement standards while addressing the unique circumstances. The review of requests must include assessment of supporting documents, verification of benefits in terms of cost, quality, and time, and evaluation of risks. Approved permits are limited in scope and duration, with responses copied to internal audit units and reported quarterly to the Authority. Furthermore, once a regular procurement procedure is underway, it cannot be halted to seek special permission, and all decisions and executions under such permits are subject to audit by the Authority and oversight bodies.

  • Procurement Approaches

The Directive outlines seven procurement approaches that Public Bodies may adopt depending on the frequency, gravity and scale of their needs. Strategic procurement is applied to procurements deemed to have national importance and may be centrally executed by a designated institution upon MoF’s approval. These procurements, which relate to major government functions or national priorities, must comply fully with the Public Procurement Proclamation and the Directive.

  •   Framework Procurement

Framework procurement is designed to enable efficient and cost-effective bulk procurement of goods and services that are repeatedly needed across Public Bodies without compromising quality. Such agreements are established primarily through open bidding but may also be arranged using other appropriate methods where justifiable. Where it is determined that regularly comparing bidders is not in the economic interest of Public bodies and list of item procured centrally does not include the required goods and services, a framework procurement could extend up to two years, or five years in the case of office rentals. The Authority plays a central role in degerming list of goods and services, supporting capacity-building, making available the market price taken from Ethiopian Statistic Agency to the government electronic system, prepare standard bidding documents and monitoring compliance. Public bodies executing central framework procurement are tasked with consolidating Public Body’ needs, segmenting procurement lots to enhance participation, issuing tender documents, conducting evaluations, executing contracts, and allocating suppliers fairly. User Public Bodies must submit their annual needs in advance, sign individual contracts based on pre-allocated suppliers, ensure timely payment and compliance of items purchased in accordance with the specifications put forward by the framework contract and evaluate supplier performance. Suppliers, in turn, are obligated to deliver as per contract terms, insure goods, remedy defects, and comply with post-delivery obligations. 

Tender procedures under framework procurement may include pre-bid meetings and must follow strict evaluation criteria based on price, submission of all required documents and technical and professional compliance and performance of bidders, with the lowest-priced, technically qualified bidder declared the winner. Multiple suppliers may be selected if planned in the bid document, and post-qualification verification may be conducted before conofficeation of the award.The Public bodies, established to execute the framework agreement, signs a general contract on behalf of user entities for the period of three years, outlining list of participating Public Bodies, delivery mechanisms, payment terms and dispute resolution procedures. Contracts are often awarded to multiple suppliers who are willing to supply at the lowest price offered, with the winning bidder guaranteed a significant share of the contract value (50% if the in case of 5 supplier and 60% for less). The contract security requirement is capped at 3% for general agreements and 10% for specific contracts with user entities to implement the framework agreement, and securities are released based on performance, fulfilment of all obligations and satisfactory delivery of the respective individual contracts. Contracts may be terminated for performance failures, market shifts, or changes in institutional needs, with a one-month notice required. 

User Public Bodies, in consultation with central executing body, could sign separate one-year contracts using the framework agreement, which may only be modified regarding delivery, quantity and schedule, not base pricing. They must ensure orders align with submitted needs by planning the timing and quantity of orders, resolve disputes through the central entity, and promptly report supplier breaches. Technological changes are permissible if they meet quality standards and do not incur additional costs. Contracts for recurring needs cannot exceed two years unless specifically justified for longer durations, such as rentals. All amendments and procurement activities must adhere to the governing laws and procedural requirements to ensure transparency, competitiveness, and public value.

  •   Joint Procurement

Joint procurement is a coordinated approach whereby two or more Public Bodies collaborate to procure goods, works, or services that fulfill shared needs, excluding items centrally procured by the Authority. This arrangement requires the prior inclusion of the intended procurement in each participating entity’s annual plan and must be based on demonstrable economic benefits such as cost savings, improved efficiency, reduced transaction costs and the leverage of economies of scale. The participating entities must designate a lead Public Body to consolidate requirements, prepare the bidding documents, and oversee the procurement process. A Memorandum of Understanding (MoU) is jointly prepared and signed, detailing the rationale, list of participating entities, scope, responsibilities, process for preparing and approving tender documents, and contract administration mechanisms. Although the bidding documents may be prepared collectively or individually, and the tender evaluation conducted jointly or by designated professionals, each Public Body will enter into a separate contract with the successful bidder. Performance guarantees and contractual terms are managed in accordance with the MoU. The process follows national open tender procedures and is conducted through the government’s electronic procurement system. Final contract prices must be verified against market benchmarks, and the lead entity must submit a report to the Authority outlining the economic benefits achieved. Any additional procurement beyond the initial scope must meet the criteria and thresholds specified under the Directive.

  •   Lease, Forced Accounts and Turnkey Procurement and Electronic Reserve Auction

Additional procurement approaches address more specialized or situational needs. Lease procurement enables Public Bodies to acquire goods through leasing when it is financially and operationally feasible compared to direct purchase. The lease agreement includes its duration, payment, maintenance responsibility, insurance, dispute resolution mechanism and termination clauses. Force account procurement is used when a Public Body undertakes minor construction or maintenance projects using its own resources such as labor, machinery  and materials instead of hiring external contractors. This method is reserved for cost-effective, non-complex projects that can be delivered in-house without compromising quality or accountability. Turnkey procurement involves contracting a single supplier to deliver a complete facility or system, taking full responsibility for design, construction, supply, installation, and commissioning. This is used for large-scale and complex infrastructure projects where integration of procurement activities under one entity to be completed within a set of two stages timeframe and the scope of work as well as the price is not open to changes. Finally, electronic reverse auction is a procurement technique conducted entirely through the electronic procurement system, allowing prequalified bidders to submit decreasing price offers in real time until the lowest offer is achieved. Prior registration is required to engage in the system and the evaluation process should grant equal access to all bidders and protect the confidentiality of the auction. 

  • Procurement of Construction Works
  •   General Qualification Requirements

The Directive sets out detailed qualification criteria for bidders in the procurement of construction works, requiring them to demonstrate prior performance, relevant experience, financial capacity, technical competence and equipment availability. Bidders must submit verifiable information on their past performance, which may be authenticated through contract documents or site inspections where the information is acquired from third parties. General experience requirements vary by contractor classification: domestic contractors in Grades 1 and 2 must have at least five years of experience while foreign contractors must demonstrate eight years of relevant work. As to the remaining Grades, three years of experience is required for Grade 3 contractors and two for 4 and 5 Grades. In terms of relevant work experience, contractors must have completed in the last 10 years at least one similar project and two similar projects for domestic and foreign contractors respectively with 70% completion for domestic and 80% for foreign bidders. Alternatively, in case where the estimated value is lower than three billion, a combination of three projects is required to meet cumulative value one-third thresholds. However, if it is higher than the stated amount, one project with cumulative value of one fourth is sufficient. 

Financial qualifications include submitting five years of audited financial statements (or fewer for newer contractors) and meeting annual turnover thresholds calculated using multipliers of 0.6 for domestic, 2 for foreign, and 1.2 for joint ventures. Exchange rate adjustments are applied to address currency fluctuation of the annual turnover figures submitted by bidders. Additionally, contractors must prove they have qualified professionals, either permanent or temporary, available for the project and provide evidence of access to the required construction equipment, whether owned or leased. For projects with multiple sub-construction works, contractors must meet qualification requirements both individually and in total for all the small scale constructions projects they wish to undertake, with Public Bodies retaining discretion to award contracts based the advantage it beings about.  

  •   Minimum Qualification Requirements

Minimum qualification requirements are provided as well for various types of construction work. In building construction, projects are categorized into Level 1 (low-rise, fewer than five floors), Level 2 (mid-rise, 5–15 floors), Level 3 (high-rise, 15–45 floors) and Level 4 (mega high-rise, above 45 floors). Domestic contractors must have completed works at least one level below the proposed project to qualify, while foreign contractors must have equivalent or higher experience. In bridge construction, similar tiers apply, short-span (under 25 meters), medium-span (25–50 meters) and long-span (over 50 meters) with domestic contractors progressing level by level, and foreign contractors required to demonstrate experience matching or exceeding the proposed span. Public Bodies may demand further specialization from foreign bidders based on bridge type. For road projects, works are classified as asphalt concrete pavement, surface treatment, gravel surfacing, heavy maintenance, and routine or periodic maintenance. Domestic contractors must again show experience one level lower than the intended project, with qualifying experience defined by type and method whereas foreign bidders must have more or comparable experience and financial capacity not below the project’s estimated cost. Similarly, in dam and canal construction, domestic contractors must have completed works one grade below the current tender, with dams classified as small (under 3 hectares), medium (3–10 hectares), and large (above 10 hectares), and canals as small-scale (serving under 200 ha), medium-scale (200–3,000 hectares), and large-scale (above 3,000 hectares). Foreigners are not included in the construction of dams and canals.

  • Bid Procedure
    •   Pre-Submission Stage

The bid procedure under the Directive begins with a formal advertisement issued through the electronic procurement system, a widely circulated newspaper, or another reliable medium to ensure broad participation. The advertisement must include key details such as the name and address of the procuring entity, a description of the goods or services, procurement method, eligibility requirements, bid submission deadlines, opening date, bid security requirements and any relevant conditions, all written in the same language as the bidding document. The bidding document itself must be based on the standard template issued by the Authority and must clearly define payment terms, contract type and its conditions. While core sections like the Instructions to Bidders and General Conditions of Contract cannot be altered, Public Bodies may make changes where appropriate other components and seek prior approval for using non-standard formats from the Authority. Detailed instructions to bidders are to be presented alongside a Bid Data Sheet that outlines requirements for local and foreign bidders, bid submission and opening timelines, applicable preferences, evaluation method and criteria and lodging complaints, which are among the notable mentions. Technical specifications must accompany the bidding documents, and where applicable, samples may be required to complement or replace specifications, and in the absence of samples, documentary evidence would suffice. Submitted samples must be handled securely and returned unless retained for reference purposes. Clarifications or amendments to bid documents may be requested by bidders within defined timeframes depending on the bid’s floating period, and Public Bodies must respond promptly and when it deems necessary, amend the bidding document based the request of the bidders. The bid process and all supporting documentation must be conducted in the official language stipulated in the bidding document; discrepancies in translated documents may result in rejection if they materially alter the content.

Bidders are required to determine their prices independently, and all bid prices must remain fixed during the validity period. The bid validity period, which must not exceed 45 days unless otherwise justified by the Authority, shall be clearly indicated in the bid document and may be extended for additional days, with the request addressed to bidders to accept. Should any bidder refuse to extend the validity or fail to update the bid security accordingly, they will be disqualified, without forfeiture of their bid security. Bid security is mandatory for most procurements with the exclusion of consultancy services and price quotation method, and ranges between 0.5% to 2% of the estimated procurement cost with a ceiling of two million Birr. It may be submitted as a bank payment order, an unconditional bank guarantee or a conofficeed letter of credit. In some circumstances, a signed bid security declaration may substitute formal security. The amount must account for factors like market volatility, competition level and potential damages to the Public Body. The security must be valid for at least 28 days beyond the bid’s validity period.

  •   Evaluation Stage

The bid submission process begins immediately after the advertisement and remains open until the deadline specified in the bidding document. Bidders submit through the government electronic procurement system, which stays accessible until closure. Upon bid opening, which must occur at the stated time and date, Public Bodies ensure transparency by permitting bidders and authorized observers to witness the process, whether in person or online. Bids are opened by a team of three procurement professionals and all relevant details such as bidder names, bid prices, discounts and securities are formally recorded and shared. Technical and financial documents may be opened jointly or separately. Preliminary screening checks for bid security and essential legal documents, though minor omissions such as legal certifications may be corrected post-opening if dated prior to bid closure. Detailed evaluations then follow, beginning with technical compliance and followed by financial assessment. In cases of tied scores, quantitatively measurable criteria which are already stipulated under the bid document are used for a final competitive evaluation after preference is given to domestic goods and services and if the tie still exists, further tie-breaking is done via lottery. For financial evaluations, unconditional price discounts are considered and any arithmetic errors corrected with bidder consent. Bids with errors exceeding 10% of the total price or those materially deviating from technical specifications are disqualified. For international bids, financial proposals should be inclusive of all applicable tax and, if the bidder fails to do so, the bid will be considered as tax inclusive. 

A bid is deemed unusually low or excessively high if it significantly deviates from market benchmarks. For goods, a bid is considered inflated if it exceeds prevailing market prices by over 10%, or unusually low if it is 30% below other bids. For consultancy and non-consultancy services, a “broken bid” is one that is over 20% or lower than 10% of the market rate and competing offers. In construction, a bid exceeding the engineering estimate by more than 15% is inflated, while one falling more than 20% below is broken. These estimates must be based on up-to-date market data and supported by the report from Ethiopian Statistical Service and reviewed quarterly (year). Before rejecting such bids, Public Bodies must investigate and allow the bidder to justify their offer, citing reasons such as alternative methods, favorable conditions or strong past performance. The Public Body must respond within 10 working days and may reject the bid if the justification is inadequate. In case of an unbalanced bid price, where specific items are disproportionately priced, may prompt the Public Body to request a cost breakdown. If disproportionality is conofficeed or unexplained, an additional performance guarantee of up to 5% may be required or the bid may be rejected.

  •   Conofficeation Stage

Communication with bidders post-opening is restricted to necessary clarifications and evaluations must be completed within the bid validity period. Final decisions rest with the endorsing body, which can accept, request reevaluation or cancel the procurement entirely. If disagreements arise between the evaluation team and the endorsing body, dissenting views are noted, but the endorsing body’s decision prevails, unless overruled by the head of the Public Body in case of a dispute. Once the bid evaluation is finalized, Public Bodies are required to publish the results via the electronic procurement system, ensuring transparency regardless of whether technical and financial submissions were joint or separate. Notifications sent to the winning bidder must specify the contract price, signing deadline and consequences of refusal, though this does not yet form a binding agreement. If the winning bidder refuses to sign or furnish a performance guarantee, the contract may be awarded to the next best bidder, provided price validity is conofficeed. Returned bid securities are contingent upon either contract signing or expiration of validity for unsuccessful bids. Before contract award, the Public Body may conduct a post-qualification evaluation to validate the winning bidder’s declarations to check legal standing, financial stability, technical capacity and relevant experience by using methods such as site visits, document review and personnel interviews. The scope, process, and criteria for post-qualification evaluation must be clearly stated in the bid documents, and the bidder is obliged to cooperate. If the bidder fails to submit necessary documents within fifteen days or is found to have misrepresented information, the bid is canceled, and the contract may be offered to the next eligible bidder, who will undergo the same verification process.

  1. Procurement Contract Management and Resolving Contract Disputes

The Directive puts forward detailed provisions for procurement contract management, encompassing contract formation, execution, price adjustment, payment and closure. All procurement contracts must be executed in writing and reflect the mutual agreement of the Public Body and the supplier., which becomes effective after both parties sign it. It has to incorporate standard bidding documents, general and special conditions, detailed obligations, payment terms, dispute resolution mechanisms, and conditions for amendments. Prior to signing, the Public Body must conoffice supplier eligibility, budget availability and contract approval, and secure performance guarantees of no less than 10% of the contract value. Advance payment up to 30% of the total contract price maybe be paid to the contractors based on the need of the Public Body and provided that the contractor supplements advance payment guarantee from insurance companies. Moreover, a separate bank account is opened in the name of the contractor for the purpose of depositing the advance payment and in accordance with the advance payment agreement concluded between the parties, the local contractor could allocate from the deposited amount up to 50% for road works and up to 30% for building works to purchase equipment. Any amendment regarding the contract has to be made in writing, signed by the parties or their authorized agents and incorporated into the signed contract document to take effect. Price adjustments are permitted for construction contracts lasting 12 months or more and framework procurements lasting 6 months or more, with adjustment limits set at the maximum of 30% for procurements other than consultancy (which is 20%) and 25% for construction, which are subject to approval by MoF in case the amount is higher. These adjustments rely primarily on data from the Ethiopian Statistics Service or, where unavailable, data from recognized manufacturers. Contracts must also detail delivery procedures, including inspection protocols conducted by designated committees, verification of quality and compliance with specifications. 

Payments must be made within 30 days of delivery, subject to verification of compliance with contract terms, and construction-related payments must be based on certified work progress. When advance payment is forwarded for construction materials on-site, the amount has to be limited to 60% of their value, with provided that the contractor ensures the payment from being diverted for other purposes and insurance coverage for losses. A retention of 7% is withheld from each payment, with half released upon temporary acceptance and the remainder after a one-year maintenance period unless replaced by an unconditional guarantee extending to 12 months. Contracts must be closed only after conofficeing the full delivery of goods or services, monitoring of guarantees, and settlement of all payments and obligations, including those involving third parties such as insurers and customs. In case where the supplier fails to complete the agreed work, liquidated damages apply, with a daily penalty of 1/1000 of the payable amount and a cap at 10% of the contract value, after which the Public Body may terminate the contract. Grounds for termination include supplier non-performance, legal or economic constraints or force majeure events, such as natural disasters, war, or government prohibition explicitly defined and distinguished from non-qualifying causes like price increases, enactment of onerous legislation with respect to the contract and labor strikes. All communications between parties must be in writing, and disputes are to be resolved first through dialogue, and if unresolved, through legal processes or alternative dispute resolution mechanisms, such as arbitration. Contracts must clearly identify the arbitration body, governing law and arbitrator selection process and applicable procedural rules.

  1. Complaint Mechanism and Offense Reporting

The Directive outlines a complaint and appeal handling mechanism in public procurement, beginning with a provision that allows any candidate or bidder who believes they have suffered or may suffer harm from a completed or ongoing procurement process to lodge a complaint to the Head of the Public Body or, in certain cases, directly appeal to a designated Board of Appeal. Complaints must generally be submitted before the contract is signed, although exceptions exist where the contract was executed prematurely before the expiry of complaint submission period or without proper disclosure of tender results. Complaints must be filed within five working days of awareness of the issue, and the Head of the Public Body must respond within seven working days. In cases where technical and financial proposals are submitted separately, complaints against the technical evaluation must be lodged before financial proposals are opened. Any bidder may submit  a complaint following 5 days of notification, but in case where it was submitted to the Head of Public Body, the financial proposal remains unopen until a response is provided in 5 days. The complaint decision must be thorough, stating legal grounds, reasoning, and evidence. If the Head fails to respond in time within 7 days, the appellant may escalate the matter to the Board within five days. The Board of Appeal, established under the Public Procurement Proclamation, comprises seven members appointed by the MoF. The Board has broad powers including suspending procurement, requesting documents, ordering investigations, and compelling testimony. Its decisions may include allowing interventions, deferring hearings, or ordering the submission of technical or legal evidence. A dissatisfied party may request reconsideration based on fraud or misconduct and, on legal interpretation matters, may appeal to the Federal Supreme Court within 15 working days. 

Public Bodies that encounter misconduct such as fraudulent behavior, collusion, contract refusal or breach of obligations must file an offense report with Authority. Upon receiving a report, the Authority informs the accused bidder or supplier and requires a written response with evidence within seven working days. The Authority evaluates both parties’ submissions in light of the law, tender documents, and contract provisions and must issue a decision within fifteen working days. Sanctions include a minimum two-year debarment and registration revocation for grave offenses such as bribery, document falsification, price collusion, or repeat violations. Lesser infraction such as failure to deliver, refusal to sign after award, or repeated minor breaches can result in suspension of six months to two years. Warnings may be issued for first-time or low-severity violations, especially by small enterprises, associations, or entities facing external constraints like currency shortages. All decisions are binding and shared with federal, regional, and academic institutions and published online. Public Bodies may also seek damages as per contract law. The Authority may reconsider its decisions if the parties resolve the dispute or new evidence is presented, and may modify, lift, or uphold the penalty accordingly. If the misconduct is determined to be criminal, the Authority is mandated to refer the matter to the appropriate law enforcement agency, accompanied by the necessary evidence and documentation for prosecution. 

.

This article is general information and not legal advice. Contact us about your specific situation.